Kinder Morgan Products Pipeline Engineering Group has recently engaged Clean-Co Systems into the Wash Water Operation at the Galena Park Splitter Station with better than expected results. The process was initially design to have one month duration and have the Clean-Co Systems Steam Generator running on a 10 hour/day limit.


The operation was heavily modified due to the characteristics of the fluid, the environmental and weather conditions, and the intrinsic features of the available equipment. Clean-Co Systems was very accommodating and assisted us all the way with such changes, working with us in not getting a budget over-run while maintaining a continuous operation as smooth as possible.